Production Planning and Scheduling
- Capacity Planning: Evaluates production capacity and ensures optimal utilization of resources.
 - Master Production Scheduling (MPS): Generates a schedule for manufacturing products based on demand forecasts and resource availability.
 - Material Requirements Planning (MRP): Determines the required materials and quantities based on the production schedule and inventory levels.
 - Shop Floor Control: Tracks and manages the progress of manufacturing operations on the shop floor.
 - Work Order Management: Creates and manages work orders, including routing, operations, and job sequencing.
 - Production Tracking: Monitors real-time production status and tracks work-in-progress.
 